The preparation

Starting from the digital architectural plans and stability calculations we create 3D production drawings. This is done in consultation with the contractor and, takes in consideration, the site conditions and available materials.

The production

The story-high walls and gables, are computer controlled and in optimum conditions, automatically glued with a high performance mortar. The up to 12 m long walls are sawed with a CNC based water cutting machine in any desired shape and up to the mm correct. Already during the planning, windows and door openings are determined and the lintel is integrated into the full prefabricated automatic process.

The transport

The walls that are produced and delivered according to the assembly order are placed on container pallets and transported by truck to the construction site. Lifting devices are integrated in the wall so that lifting can take place efficiently and without any additional tools. In this way we minimize the waste on site, ensure safe and quick placement.

The installation

The “just in time” deliveries ensures that the walls can be placed according to the preplanned schedule and without disruption on the construction site. Increase the efficiency of the constructor, that’s our goal! After the alignment of the wall elements are placed on the in the non-shrink grout. Through tension and compression struts one places given the wall level, and a temporary support. The connections between the walls is done by grouting with high efficiency adhesive mortar. The assembly can optionally be outsourced to an installation partner of Struxura.

 

Contact

 

Questions ?

Are you owner, contractor, architect, engineering firm, ... you have questions. Feel free to ask them! You can reach us by using the contact form, email or telephone. We will listen carefully and work together to find the best possible answer. That’s what partners are for!

Vacatures © 2015 Webdevelopment by Publivents